1983 - 1984 |
SAC Cottbus from the GDR (now ABB Cottbus) |
Process Design Engineer |
Draining of the open-cast mining remains holes nearby Belgrade/Croatia
To the supervision of the Draining of the open-cast mining remains holes a central supervision has to be created. A remote system shall to be installed for approx. 100 wells, which one connected over cable to all these wells. The design was carried out.
The contract Conditions are similar with FIDIC Yellow Book. |